(Tarsus Pozantı)Int.-Adana - Toprakkale - Gaziantep Motorway

Location

:

Adana - Gaziantep/ TURKEY

     

Services Provided

:

Construction supervision

     

Client

:

General Directorate of Highways

     

Period of Service

:

08.1987 - 03.2005

     

Associated Firms

: Dar Al Handasah (UK) and
DMM (Turkey) (Temat is a leader)
     

Project Cost

:

1.245.065.000 USD

     

Cost of Services

:

52.110.000 USD

Key Factors of Project :

• 258 km. 2x3 lanes motorway (27 km 2x4 lanes incl.)
• 58 km. 2x3 lanes connecting roads.
• Total 5016 m, 4 double-tube tunnels
• 12 PC and 2 continuous steel box-girder special viaducts
• 17 grade seperated interchanges
• 12 river bridges, 55 overbridges, 103 underbridges

 

 

Scope of Services :

• Design reviev of motorway, structures, electro-mechanics
• Progress monitoring and cost control
• Construction supervision
• Quality control
• Consultancy
• Certification