Renovation and Widening of Golden Horn Bridge

Project Location

:

İstanbul - TURKEY

     

Services Provided

:

Design check and supervision of construction

     

Client

:

General Directorate of Highways

     

Period of Service

:

08.1994-12.1998

     

Associated Firms

: COWI-Denmark (The Leader)
     

Project Cost

:

11.093.000.000 JPY

     

Cost of Services

:

660.000.000 JPY

Key Factors of Project :

• Renovation of 822m long orthotropic steel girder Golden Horn Bridge
• Two additional steel box-girder bridges on both sides
• Very deep steel piles in sea-mud
• Improvement of nearby interchanges
• Total 800m PC new viaducts and many small structures

 

 

Scope of Services :

• Technical inspection. review of repair and strengthing methodology
• Supervision of the renovation works of existing bridge
• Design ewview, and consultancy
• Construction supervision og new steel bridges, roads, interchanges and other structures
• Quality control
• Certification of payments