Pozantı - Adana Motorway (Section-III)

   Project Location :
Adana-TURKEY
     
Services Provided : Design Engineering Services
     
Client :
General Directorate of Highways
     
Period of Services : 11.1973-10.1976
     
Associated Firms : None
     
Project Cost : 140.000.000 USD
     
Cost of Services : 180.000.000 USD
Key Factors of Project : • 13 km 2x3 lanes motorway
• 2 PC viaducts
• 3 PC overbridges
• 2 PC underbridges
• 2 interchanges
 
 
Scope of Services : • Detailed design of motorway alignment, interchanges viaducts and bridges
• Geotechnical design of cut and embankment slopes
• Preliminary and detailed design of retaining structures