Ankara-İstanbul High Speed Railway Project

   Project Location :
Ankara - TURKEY
     
Services Provided : Design Engineering Services
     
Client :
General Directorate of Railways,
Harbours and Airport Construction
     
Period of Service : 09.1977-03.1981
     
Associated Firms : OBERMEYER Project Management Gmbh-Germany (The leader)
     
Project Cost : -
     
Cost of Services : 3.600.000 USD
Key Factors of Project : • 240 km double-track high-speed rail
• 12 viaducts
• Tunnels (Total 60 km)
• 89 bridges
• 8 stations  
 
Scope of Service : • Technical and economic feasibility study (240 km)
• Traffic planning (240 km)
• Geodetical works-mapping (240 km)
• Geotechnical investigations (240 km)
• Preliminary studies and preliminary design of alignment, tunnels, viaducts, bridges and other enginnering structures (240 km)
• Final design of alignment (70 km), stations (3), tunnels (5600m+950m+950m), viaduct (1), bridges (33) and other enginnering structures