16. Division of General Directorate of Highways

Project Location

:

Central Anatolia-TURKEY

     

Services Provided

:

Construction supervision

     

Client

:
16. Division of General Directorate of Highways
     

Period of Service

:

01.2010 - ongoing

     

Associated Firms

: Gözlem Eng. (Turkey)
(TEMAT is the leader)
     

Project Cost

:

190.160.000 USD

     

Cost of Services

:

9.520.000 USD

Key Factors of Project :

• 249,6 km 2x2 lanes Highway
• 100 km Asphaltic Concrete Paving
• 6 Tunnels
• 8 Viaducts
• 26 River Bridges

 

 

Scope of Services :

• Progress monitoring and cost control
• Construction supervision
• Quality control